INFORMATION BASED ARCHITECTURE - IBA
IBA-homeabout IBAprojectspublicationstheorycontact IBA-BV

sitenightdayentrance1entrance2backnext

Shenzhen-Zhongshan Bridge Tunnel Link,China


Brief

Time:2015-2016
Location:Shenzhen,Zhongshan,China
Partner: TEC Royal Haskoning + Guangdong Highway and Infrastructural Design Institut Zhongshan.
Client: TEC Royal Haskoning + Guangdong Highway and Infrastructural Design Institut Zhongshan.

Introduction

IBA designed the artificial islands, the tunnel entrances and interior, the suspension bridge, the cable stayed bridge and the causeway.

Overall masterplan and design of the 25 km infrastructure link between Shenzhen and Zhongshan special economic zone. Consisting of one superlarge 1.6km span suspension bridge, which will form the gateway to China; a 500 m span cable-stayed bridge, a 7km tunnel and a 15km causeway

Furthermore, the masterplan design of the artificial entrance island at the side of the Shenzhen airport and the islands that forms the transfer between tunnel and bridge system.